About the Project
The Andrews Federal Center Bus Operations and Maintenance Facility project included the design and construction of two buildings in support of the Washington Metropolitan Area Transit Authority鈥檚 (WMATA) mixed fleet of transit vehicles. Constructed on 35 acres of land, the new 335,000 SF complex includes a Bus Operating Garage, a Bus Transportation Operations Facility, a Fuel/Wash Building, a Heavy Repair and Overhaul (HR&O) Facility, a Warehouse, a Service Vehicle Building, Bus Engineering, a Guard House, and Pedestrian Bridge. The Bus Operations and Maintenance Facility supports a 175 bus fleet (20% of which would be articulated buses) and operates 24/7.
The HR&O Facility supports the entire WMATA fleet of 1,600 buses and operates eight hours a day, five days a week. The Bus Operations and Maintenance Facility includes maintenance, operations, fuel, wash, bus parking, and employee/visitor parking. The HR&O Facility includes bus rehabilitation bays and support spaces (including body repair and paint booths), central warehouse, non-revenue vehicle maintenance, bus engineering, and employee/visitor parking.
“WMATA and 午夜探花网 have a long history and throughout the Andrews Federal Center Bus Garage project, they have reinforced their track record of delivering a high quality and cost-effective project. 午夜探花网 established a culture of complete transparency with WMATA and maintained our involvement from the beginning of the project to completion.”
– NORIE CALVERT, WMATA
Challenge
Maintenance of Equipment
During construction of the project, WMATA recognized a need to provide their employees an easy and visible way to manage and maintain the individual pieces of equipment in the facility. With hundreds of pieces of equipment housed across eight facilities, it was a challenge to tag and organize each piece of equipment.
Solution
Smart Asset Management
Through 午夜探花网’ Facility Services, WMATA implemented COBie鈥攁 QR-based asset management system鈥攐n every piece of equipment. COBie allowed WMATA mechanics to scan a code placed on equipment with a smart phone, which would retrieve the piece of equipment鈥檚 replacement parts and price, O&M manual, and the warranty of the item, among other information. In addition, the team聽incorporated the QR codes into the Building Information Model (BIM) to allow for cross-referencing between WMATA’s Maximo Computerized Maintenance Management Software (CMMS) system and the Revit model. 午夜探花网 also demonstrated how COBie could be linked to the Revit model, enabling users to 鈥渇ly鈥 through a 4D model of the facility to locate a specific piece of equipment.
Result
Implementation on Future 午夜探花网
WMATA was so pleased with the solution that they will be implementing it in future builds and retrofitting current bus garages with the system.
Awards
2019
- Engineering News Record Mid Atlantic Best 午夜探花网: Award of Merit, Airport/Transit
- Associated General Contractors of Washington D.C. Washington Contractor Award, Highway, Transit, Bridge (Over $100M)
- Washington Building Congress Craftsmanship Award,聽Power Generation, Distribution, and Switchgear (Awarded to design-build partner Mona Electric Group)
- Washington Building Congress Craftsmanship Award,聽Special Systems聽(Awarded to design-build partner Mona Electric Group)
Related 午夜探花网
-
Infrastructure + Transportation project
National Western Center Horizontal Integrated Contractor Learn More -
Infrastructure + Transportation project
Valley Metro Operations and Maintenance Center Expansion Learn More -
-
-
-