Eagle County Regional Airport Expansion and Remodel

About the Project

The Eagle County Regional Airport Expansion and Remodel project is a design-build expansion and remodel of the existing airline terminal at the Eagle County Regional Airport. The primary project component was the construction of a new two-level concourse for airside passenger arrival and departure. The second level concourse contains four airline gates with new passenger boarding bridges, while the first level concourse contains two ground loading gates. The area of the new and remodeled space is approximately 65,000 SF.

 

Functional spaces constructed during the project include: an expanded and relocated TSA passenger screening checkpoint, central hall, departure and arrival passenger holdroom areas, concessions, bar and restaurant, remodeled airline offices, and underside vehicle and equipment storage space for baggage handling equipment.

Quick Facts

  • Location Gypsum, CO
  • Client Eagle County Air Terminal Corporation
  • Architect Gensler
  • Industry Aviation
  • Line of Business Construction
  • Delivery Method Design-Build
  • Completion Date December 2019
  • Duration 21 Months
  • Contract Value $ 32,300,000
  • Square Footage 65,000 SF

“Eagle County was pleased with the attention to detail and cooperative nature in which the project team approached the Eagle County Regional Airport Terminal Remodel. The team approach that was portrayed throughout by Îçҹ̽»¨Íø was largely responsible for the success of this project.â€

— Josh Miller, Eagle County Construction Manager

Challenge

Overcoming Preexisting Structural Columns

A design challenge that was overcome during construction was when the airlines provided feedback that the structural columns of the new expansion, in combination with the location of the existing building columns, were going to emphasize a preexisting issue of the airline’s operations, which was their baggage cart’s inability to efficiently access the three baggage claim carousels simultaneously.

Solution

Design-Build Team’s Collaboration with Airport and Airlines

 

To address the access issue, the design-build team quickly worked through a solution with the airport and airlines to add baggage handling extensions to two of the carousels, while also removing nine existing structural columns to create a widened passing lane. Working within a tight timeline to be ready for ski season, the team put together contract documents for the baggage handling system expansion, obtained the necessary building permits, sent out the bid package, analyzed bids, executed a design-build subcontract, and procured and installed the baggage handling system extensions within four months.

Result

Functional and Operational Airport for Busiest Time of the Year

 

This design-build solution provided the additional space for a tug and three baggage carts to be safely parked parallel to all three carousels simultaneously, solving an existing operational concern and increasing the efficiency and safety of the airline’s operations.

Awards

2020

  • Engineering News Record Mountain States Excellence in Safety
  • Design-Build Institute of America Design-Build Project Award – National Award of Merit

Related Îçҹ̽»¨Íø

Contact Us

X

Oh no... this website is not a fan of Internet Explorer!

Due to some geeky technical reasons, the Îçҹ̽»¨Íø website is best viewed on any browser other than Internet Explorer. However, if you are a diehard IE fan you can continue to use it, but may have a less than great experience and will receive this annoying reminder every day. We recommend one of the following browsers to take full advantage of the Îçҹ̽»¨Íø website. Thank you!